Highlights

  • Creates a high-quality and homogeneously compacted ballast bed
  • High track geometry durability and resistance to track buckling
  • Restoration of the required lateral track resistance after tamping
  • Increase the service life of track infrastructure and reduce life cycle costs
  • Up to 30% longer maintenance cycles
  • Optimized track infrastructure availability after maintenance
  • Elimination or significant reduction of lines subject to speed restrictions thanks to systematically controlled initial track settlement

Technical data

To view the technical data and download a factsheet on this machine, please enter your contact details.

Technical data and factsheet

Gallery

Machine illustration

Zoom In
Zoom Out
back to top