Search

Search

363 results found.:

  1. 1989: EM-SAT

    History

    First on German lines

  2. 1989: K 355 APT Superstretch

    History

    New welding technology using the additional pulling device Superstretch for North America

  3. 1989: SVM 1000

    History

    Track laying machine for Iran

  4. 1989: PA 1-20 ES gantry crane

    History

    with single-sleeper laying device

  5. 1989: KEV 312

    History

    for Germany

  6. 1990: Unimat 08-475/4S

    History

    Universal tamping machine (3-rail lifting and 4-rail tamping)

  7. 1990: MTW 100.017

    History

    First catenary renewal train for installation with final tension

  8. 1990: 09-90

    History

    Continuous action levelling tamping machine with integrated ballast profiling

  9. 1990: PM 200-2

    History

    with new data bus system is put into operation in Germany

  10. 1991: DGS 72 NR

    History

    for France

  11. 1991: WM 26

    History

    Track and turnout renewal device

  12. 1991: SBM 140

    History

    for Brazilian heavy haul railways

  13. 1991: TIK System Plasser-Wiebe

    History

    Thermic vegetation control on and around the track using Infra-Plus application

  14. 1992: Unimat 09-32 4S

    History

    First continuous action 2-sleeper tamping machine for turnouts

  15. 1992: 09-Dynamic

    History

    with integrated ballast profiling and dynamic track stabilisation

  16. 1992: Combined longitudinal level and alignment laser

    History

    for tracks and turnouts

  17. 1992: SVV 100

    History

    Insertion of a formation protective layer under the skeleton track

  18. 1992: WTW 40

    History

    Turnout transport wagon

  19. 1992: EM 250

    History

    Track measuring and testing coach with non-contacting measuring systems for speeds up to 250 km/h

  20. 1992: MTW 100.013-2

    History

    First four-axle motor tower car with freely turning elevating work platform


Search results 201 until 220 of 363