Reference projects: Renewal and installation machinesFUM 100.260Staggered installation with final nominal tension without residual rippleInfrastructureConventional linesHeavy haulHigh speedField of applicationOverhead contact lineWorking modeContinuous actionCEM 100.223Overhead line installation with final tension – 1 wire systemInfrastructureConventional linesField of applicationOverhead contact lineWorking modeContinuous action
FUM 100.260Staggered installation with final nominal tension without residual rippleInfrastructureConventional linesHeavy haulHigh speedField of applicationOverhead contact lineWorking modeContinuous action
CEM 100.223Overhead line installation with final tension – 1 wire systemInfrastructureConventional linesField of applicationOverhead contact lineWorking modeContinuous action