• Zur Hauptnavigation (Accesskey 0)
  • Zur Subnavigation (Accesskey 1)
  • Zum Seiteninhalt (Accesskey 2)
  • Zur Suchmaske (Accesskey 3)
  • Machine Fleet Infrastructure
  • Company
    • back to „Company“
    • Overview
    • About Plasser & Theurer
    • Sustainability
    • Production
    • Career
    • Press
    • Events
  • Media
    • back to „Media“
    • Publications
    • Book recommendations
    • Documentaries
    • today
    • aktuellTV
    • Videos
    • Newsletter
    • Technology App
    • Tamping Game
    • ATMO app
    • DiVA – Planning of large-scale construction projects
    • Trackopedia
  • Contact
    • back to „Contact“
    • Locations in Austria
    • America
    • Europe
    • Asia
    • Africa
    • Australia
  • Partner
    • back to „Partner“

    Our network

    • Plasser & Theurer
    • Framafer
    • Nippon Plasser
    • Plasser American
    • Plasser Australia
    • Plasser do Brasil
    • Plasser Far East
    • Plasser Ibérica
    • Plasser India
    • Plasser Italiana
    • Plasser Polska
    • Plasser Robel Services
    • Plasser South Africa
    • Plasser Turkey
    • Plasser UK
    • DMA
    • DRUM
    • Ground Control
    • TMC
    • back to „Partner“

    Our Certified Plasser Partner

    • Datarail
    • VHC Servis
    • Sinvoz
    • Service Plasser Kazakhstan
  • EN
    • Deutsch
    • English
    • Français
    • Español
    • Pусский
  • Search
Plasser & Theurer
  • Machine
    • back to „Machine“

    Infrastructure

    • Overview
    • Conventional lines
    • Heavy haul
    • High speed
    • Urban transport
    • Industrial railways
    • Line with steep gradients
    • back to „Machine“

    Technology

    • Overview
    • E³ Technology
    • Tamping
    • Ballast distributing and profiling
    • Stabilization and consolidation
    • Ballast bed cleaning
    • Formation rehabilitation
    • Material logistics
    • Track renewal and track laying
    • Renewal and laying of turnouts
    • Mobile rail rectification
    • Measuring work
    • Installation of catenary
    • Track maintenance using track motor vehicles
  • Fleet
    • back to „Fleet“

    Customer Services

    • Overview
    • Spare and Wear Parts
    • Life Cycle Services
    • Machine Availability
    • Training and Support
    • Digital Services
    • Catalogue
    • Financing
    • Certified Plasser Partner
    • Used Machines
  • P&T Research
    • back to „P&T Research“
    • All categories
    • Machine
    • Infrastructure
    • Measuring
    • Smart Technologies
Menu
more about Installation of catenary

Reference projects

  • Overview
  • E³ Tech­no­logy
  • Tamping
  • Ballast dis­trib­uting and pro­filing
  • Sta­bil­iz­a­tion and con­sol­id­a­tion
  • Ballast bed cleaning
  • Form­a­tion re­hab­il­it­a­tion
  • Material lo­gistics
  • Track renewal and track laying
  • Renewal and laying of turnouts
  • Mobile rail rec­ti­fic­a­tion
  • Meas­uring work
  • In­stall­a­tion of catenary
  • Track main­ten­ance using track motor vehicles
  • Overview
  • Motor tower cars
  • Renewal and in­stall­a­tion machines
  • Overview: In­stall­a­tion and main­ten­ance of overhead contact lines
  • Reference projectsRenewal and in­stall­a­tion machines
  • Overview
  • FUM 100.260
  • CEM 100.223

Reference projects: Renewal and installation machines

FUM 100.260

Staggered installation with final nominal tension without residual ripple

Infrastructure
Conventional lines
Heavy haul
High speed
Working mode
Continuous action

CEM 100.223

Overhead line installation with final tension – 1 wire system

Infrastructure
Conventional lines
Working mode
Continuous action

Head office

Johannesgasse 3
1010 Wien
Austria
Tel.: +43 1 51572-0
Fax: +43 1 5131801
Mail: export@plassertheurer.com

Works

Pummererstraße 5
4021 Linz/Donau
Austria
Tel.: +43 732 7666-0
Fax: +43 732 775148

Works

Wintergasse 56
3002 Purkersdorf
Austria
Tel.: +43 2231 63662-0
Fax: +43 2231 63662-47

Send registration

OK
  • Privacy notice
  • Impressum
  • Legal notice
  • Terms and Conditions