Reference projects: Renewal and installation machinesFUM 100.260Staggered installation with final nominal tension without residual rippleInfrastructureConventional linesHeavy haulHigh speedWorking modeContinuous actionCEM 100.223Overhead line installation with final tension – 1 wire systemInfrastructureConventional linesWorking modeContinuous action
FUM 100.260Staggered installation with final nominal tension without residual rippleInfrastructureConventional linesHeavy haulHigh speedWorking modeContinuous action
CEM 100.223Overhead line installation with final tension – 1 wire systemInfrastructureConventional linesWorking modeContinuous action