Climate-friendly rehabilitation from the assembly line
On-track installation of formation protective layer and reconditioning of ballast
Особенности
- On-track installation of track-bed layers while operations continue on adjacent track(s)
- Ballast bed cleaning with efficient excavation of material and triple-deck ballast screening
- Ballast reconditioning increases the quality of cleaned ballast
- Efficient use of track possessions thanks to integrated supply of new ballast
- Integrated track tamping for improving the track geometry immediately after rehabilitation
- Proof of layer thickness of the formation protective layer and ballast bed thanks to laser measuring system
Технические данные
Чтобы ознакомиться с техническими данными и загрузить информационный бюллетень по этой серии машин, введите, пожалуйста, Ваши данные.




