Busqueda

Búsqueda

25 resultados encontrados.:

  1. End-to-end process presented in Sweden

    P&T Research / Artikel /

    Related links: today 134: Smart Maintenance – More than virtual reality today 135: Absolute track measurement today 139: Machine communication – putting the puzzle together We as developers…

  2. Rail grinding reduces noise emissions caused by trams

    P&T Research / Artikel /

    The ATMO (Automatic Track Machine Oscillator) rail grinding trailer has been in use at Wiener Linien for some time as part of a research project. Time to take stock. To what extent can tram…

  3. Research partners

    P&T Research /

    Research partners: shaping the future of the railway together Plasser & Theurer’s vision is to make a sustainable contribution to the success of the railway system. To ensure this, the…

  4. Complete turnout inspection in four minutes

    P&T Research / Artikel /

    The parameters measured during a turnout inspection: Track gauge Narrowest passage (between blade and stock rail) Check rail gauge Flange groove Rail profile A new non-contacting…

  5. The tamping unit that understands the ballast

    P&T Research / Artikel /

    Just like the sense of touch enables humans to handle objects according to their texture, “sensing” tamping tines enable the machine to treat ballast in an optimum manner. But how do you teach a…

  6. Research on synthetic fuels in track maintenance

    P&T Research / Artikel /

    We have set ourselves the goal of advancing carbon-neutral track maintenance and thus contributing to even greater rail sustainability. In addition to our own E³ hybrid machines, synthetic fuels…

  7. Revolutionary track inspection from the air

    P&T Research / Artikel /

    Unmanned Aircraft Systems (UAS), auch bekannt als Drohnen, sind zu einem unverzichtbaren Werkzeug für eine Vielzahl von Branchen geworden. Durch ihre Fähigkeit, über große Entfernungen hinweg…

  8. PredictiveTrackView

    P&T Research / Artikel /

    We are currently developing PredictiveTrackView, a comprehensive tool for track infrastructure operators. Its goal is to exhaust all possibilities Building Information Modeling (BIM) offers to make…

  9. All categories

    P&T Research /

    Discover the future of track construction and maintenance Plasser & Theurer’s Research and Development Department is building the future of track construction and maintenance already today. …

  10. Multichannel GPR technology detects munition remnants and other obstacles

    P&T Research / Artikel /

    Fremdkörper in Schotterbettung und Gleisunterbau, wie zum Beispiel Munitionsreste, können Instandhaltungsarbeiten signifikant behindern oder verzögern. Weder mit Metalldetektoren, Magnetometern noch…

  11. Radar: the "eye" of the machine

    P&T Research / Artikel /

    The word “radar” may make you think of air travel and parking assistants. But radars have also entered the field of railway, specifically in the form of ground penetrating radar (GPR), also known as…

  12. It started with the vision of an autonomous tamping machine

    P&T Research / Artikel /

    The turnout tamping assistance system “PlasserSmartTamping – The Assistant” by Plasser & Theurer helps the operator to manage the operational systems of the machine and represents a major step…

  13. Tracking ballast

    P&T Research / Artikel /

    Track ballast has many functions in the permanent way system. It is, amongst others, responsible for the load transfer into the subgrade, the drainage of the superstructure and the reliable position…

  14. How does a track maintenance machine think?

    P&T Research / Artikel /

    This question raises another question: “Is a track maintenance machine actually capable of thinking?” Yes, it is. Artificial Intelligence (AI) enables machines to learn from experience and adapt to…

  15. Smart Technologies

    P&T Research /

  16. Measuring

    P&T Research /

  17. Infrastructure

    P&T Research /

  18. Machine

    P&T Research /

  19. EM100VT – The future of track inspection starts today

    P&T Research / Artikel /

    523 track kilometres, 224 turnouts, 80,000 sleepers and far more than 325,000 tonnes of ballast: These are the hard facts about the renewal of the high-speed line 1733 between Hanover and Würzburg.

  20. Dynamic stabilization of new track types in the laboratory

    P&T Research / Artikel /

    In her doctoral thesis Sophie Feurig focuses on a detailed analysis of dynamic track stabilisation in the laboratory. An in-depth understanding of the system behaviour of the ballasted track sparks…


Resultados 1 a 20 de 25