Publications

Title Author Nr. Year Medium
The quest for quieter trams J. Kehrer, F. Hansmann 2 2018 Metro Report International
Faster ballast bed cleaning of turnouts by means of the URM 700-2 H. Wörgötter, M. Zuzic, N. Waldhör 2 2018 REI
How to integrate digital technologies Florian Auer 5 2018 GRR
Smart Tamping – Fields of Application of the Turnout Tamping Assistance System F. Auer, D. Buchbauer, M. Bürger, G. Jodlbauer, A. Theiß, G. Zauner 2 2018 ETR-I
Plasser & Theurer: Delivering safety, reliability and cost-efficiency C. Peinsipp B. Metzger 5 2017 GRR
Innovation boost in track maintenance R. Wenty 1 2017 ETR-I
Reducing the occurrence of inner curve corrugations F. Auer   2016  
40 Years of “Dynamic Track Stabilisation” K. Rießberger R. Wenty   2015  
The URM 700: the first machine enabling ballast cleaning in turnouts in assembly-line method H. Wörgötter M. Zuzic 1 2015 ETR-I
Multi-function track recording cars F. Auer 3+4 2013 RTR
Innovations and proven equipment at the iaf 2013 R. Becker 2 2013 RTR
Track ballast in Austria Ch. Kuttelwascher 88/89/90 2012 RI
Modern track renewal on the West Coast Main Line R. Spoors 4 2012 RTR
Track formation improvement - problems, development and implementation: Part 1. K. Lieberenz F. Piereder 85-86 2011 RI
DB Netz uses satellites to locate track in three dimensions L. Marx 11 2008 RGI
13 years of experience with rail-mounted formation rehabilitation on the Austrian network F. Auer R. Schilder M. Zuzic H. Breymann 1 2008 RTR
Non-destructive continuous dynamic measurement of lateral track resistance offers real-time results directly after track maintenance R. van den Bosch 2 2007 REI
Plasser & Theurer machines and technologies applied for track maintenance of high-speed railway lines: a selection R. Wenty 1 2007 REI
Systems analysis of point-relaying machines T. Siefer L. Lücking 1 2007 RTR
Latest Developments in Track Rehabilitation and Maintenance R. Wenty   2007 RTR
Machines and technology for high-capacity lines R. Wenty 2 2006 ERR
Installation, renewal and maintenance of overhead catenary systems by means of a specially designed catenary installation and renewal machine M. Irsigler 4 2006 REI
Optimized deployment of track maintenance machines thanks to the use of high-quality wearing parts P.Flatscher 4 2006 RTR
High-capacity, precision and reliability in track maintenance R. Wenty 3 2006 RTR
Cost-effective repair and overhaul of track-maintenance machines: Nationwide experience in Germany P. Flatscher 2 2006 RTR
Criteria for cost-effective ballast cleaning: machine design considerations H. Misar 4 2005 REI
Ballast cleaning of single-track lines: a strategic analysis R. Schilling 1 2005 REI
Innovative catenary installation technology applied on German Rail W. König U.Michalski 2 2004 REI
Greater availability of track maintenance machines due to the use of new wear-resistant materials P. Flatscher 3 2004 RTR
The EM-SAT 120 Track Survey Car, an integrated part of the track geometry data base of the Austrian Federal Railways ÖBB E. Sackl 2 2004 RTR
Bringing Objectivity into System Decisions between Ballasted Track H. Koriath A. Hamprecht H. Huesmann P.Ablinge 2-3 2003 RTR
Intelligent Ballast Management Will Cut Costs H. Misar 8 2002 IRJ
Plasser Combo Provides High-Capacity Maintenance   3 2002 IRJ
Track substructure renewal on Polish State Railways H. Beczkowski 2 2002 REI
Optimised catenary maintenance measures on Austrian Federal Railways J. Kohel 1 2002 REI
Further Development of Mechanised Ballast Cleaning E. Klotzinger 2-3 2002 RTR
Track Machine Costs Need To Be Optimised R. Wenty 12 2001 IRJ
Innovative Measuring System Unveiled G. Oberlechner J. Zywiel 9 2001 IRJ
IM2000 Infrastructure Measuring Car: the application of recording results G. van der Merwe L.C. Zaayman P.B. Venter 4 2001 REI
Measuring tunnel clearances faster B. Metzger 5 2001 RGI
Plasser's Monster Millennium Machine   3 2000 IRJ
Formation rehabilitation on Austrian Federal Railways - five years of operating experience with the AHM 800-R R. Schilder F. Piereder 4 2000 REI
The EM 250 high-speed track recording coach and the EM-SAT 120 track survey car, as networked track geometry diagnosis and therapy systems G. Presle 3 2000 REI
New catenary renewal technology introduced on Polish State Railways P. Koroblowski 2 2000 REI
Machines for Catenary Construction and Maintenance R. Wenty 2 2000 RTR
Plasser & Theurer uses cookies to allow you to use the website as conveniently as possible. By browsing the website, you agree to the use of cookies. For more information on cookies and how to delete them, please see our privacy notice.