MTW 100.304

Safety at the top

Maintenance of the overhead line with column elevating platform and loading crane

Einsatz-Optionen verbergen
Infrastructure
Heavy Haul
High Speed
Conventional Lines
Industrial Railways
Line with steep gradients
Working mode
Spot maintenance

Heavy-duty motor tower car with three-part column elevating platform and loading crane with cabin

Features

Quality cuts costs: our machines turn a tidy profit

To date, Plasser & Theurer has supplied 16,700 machines. Most of them are still in operation. This attests to the quality of the machines and the value of our Customer Services’ life-long machine and fleet support. Plus, it proves that high quality ensures high cost-efficiency: machines that have been in operation for 20 or 30 years paid off years ago.