Highlights

  • On-track installation of track-bed layers while operations continue on adjacent track(s)
  • Ballast bed cleaning with efficient excavation of material and triple-deck ballast screening
  • Ballast reconditioning increases the quality of cleaned ballast
  • Efficient use of track possessions thanks to integrated supply of new ballast
  • Integrated track tamping for improving the track geometry immediately after rehabilitation
  • Proof of layer thickness of the formation protective layer and ballast bed thanks to laser measuring system

Technical data

To view the technical data and download a factsheet on this machine, please enter your contact details.

Technical data and factsheet

Gallery

Machine illustration

Zoom In
Zoom Out
back to top